Final | 7/27/2000 | 7/27/2000 | 7/27/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 08:26:43. Contact: ###-####. Ok final 7/28/00 9:57:53 AM
|
Permanent Service | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
Pat Lass
|
|
|
reinspection Barbara ###-####
|
Final | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 07:39:18. Contact: ###-####. no power 7/19/00 7:19:44 AM
|
Electrical Rough-In | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | PASS |
Pat Lass
|
|
|
wall cover ###-#### Doug
|
Electrical Rough-In | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | NR |
Pat Lass
|
|
|
wall cover ###-####
|
Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
Pat Lass
|
|
|
underground ###-#### late pm U/G to sigh ok 5/3/00 3:26:25 PM
|
Electrical Rough-In | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PART |
Marv Burrus
|
|
|
###-#### Trench-PVC ok. 4/24/00 12:04:19 PM
|
Electrical Rough-In | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Pat Lass
|
|
|
this is for 9:00 per you\\underground\\###-#### Large rocks. 4/21/00 1:58:31 PM
|
Electrical Rough-In | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | FAIL |
Pat Lass
|
|
|
SLAB\\###-#### Failed- conduit in slab already covered T/W elect. contractor. 4/21/00 9:06:00 AM
|
Rough-In Permanent Service | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | FAIL |
Pat Lass
|
|
|
###-#### No work done 4/17/00 1:26:44 PM
|