Final | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/15/2000 at 15:29:13. Contact: ###-####.
|
Final | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | NH |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 15:17:50. Contact: ###-####.
|
Final | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 11:23:29. Contact: ###-####.
|
Electrical Rough-In | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | PASS |
Jack Frank
|
|
|
after 10:00 ###-#### ceiling ok 5/2/00 10:48:39 AM
|
Electrical Rough-In | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | FAIL |
Pat Lass
|
|
|
delbert ###-#### r/i BCC no code violation will be retained. 4/28/00 12:08:45 PM
|
Electrical Rough-In | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PASS |
Pat Lass
|
|
|
###-#### Wall R/I ok 4/13/00 1:07:14 PM
|