Final | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/10/2000 at 08:09:23. Contact: ###-####. Ok 7/11/00 11:30:14 AM
|
Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PASS |
Jack Frank
|
|
|
call to meet there ###-#### pager ok 7/7/00 1:47:18 PM
|
Electrical Rough-In | 5/9/2000 | 5/9/2000 | 5/9/2000 | P | PASS |
Jack Frank
|
|
|
mark ###-#### voice pager===call 1st before insp--r/i WALLS 5/9/00 8:18:00 PM
|