Final | 2/20/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Marv Burrus
|
|
|
fn insp-- ted ###-#### . 2/22/2002 1:45:56 PM
|
Electrical Rough-In | 9/6/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Marv Burrus
|
|
|
conference Paula ###-####. range circuit installation 9/10/2000 6:05:01 PM
|
Electrical Rough-In | 6/23/2000 | 6/26/2000 | 6/26/2000 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 16:59:02. Contact: .
|
Final | 6/20/2000 | 6/23/2000 | 6/23/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 14:53:55. Contact: ###-####. Conference only 6/26/00 3:45:54 PM
|
Electrical Rough-In | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | CANC |
Jim Schmer
|
|
|
###-#### after 4 pm - should have been a p/s - jms
|
Permanent Service | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | PASS |
Jim Schmer
|
|
|
p/s o/h rec. ok
|
Electrical Rough-In | 5/12/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 17:04:21. Contact: ###-####. after 4. Conference; service panel, branch circuit code requirements. 5/22/00 9:06:31 AM
|
Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | CANC |
Marv Burrus
|
|
|
TED ALLEN ###-#### CALL FIRST TO MEET FOR CONFERENCE Owner will reschedule. 5/4/00 4:54:03 PM
|