Final | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 10:21:38. Contact: . completed. 8/30/2000 5:08:08 PM
|
Electrical Rough-In | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 09:15:28. Contact: ###-####.
|
Electrical Rough-In | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 13:42:31. Contact: ###-####.---s.e. corner of the building Interior walls ele. R/I 6/21/00 11:54:54 AM
|
Electrical Rough-In | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PART |
Marv Burrus
|
|
|
southeast door and 1 wall ###-#### Sarah 1-wall Ele. R/I 5/31/00 4:29:41 PM
|
Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PASS |
Marv Burrus
|
|
|
conference Dane ###-#### Conference with Dany Meyer- NEC 300-21; all wiring in air plenum shall be fire rated. 5/3/00 3:35:28 PM
|
Electrical Rough-In | 4/28/2000 | 5/1/2000 | 5/1/2000 | A | FAIL |
Marv Burrus
|
|
|
dane ###-#### conference only please call Message phone disconnected unable to call for conference 5/1/00 3:43:14 PM
|
Electrical Rough-In | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | CANC |
Jack Frank
|
|
|
conference Brian Stroschein ###-#### MARV WILL DO IT IN THE PM 4/26/00
|
Electrical Rough-In | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 09:26:07. Contact: ###-####. best call before going ONE WALL OK 4/19/00
|