Final | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 14:25:35. Contact: ###-####. Ok 6/13/00 2:44:55 PM
|
Final | 6/5/2000 | 6/6/2000 | 6/6/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/05/2000 at 13:52:11. Contact: ###-####. No access to j tub receptacle outlet called 6/6/00 2:02:16 PM
|
Final | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/05/2000 at 08:21:33. Contact: ###-####. need access to j tub 6/6/00 11:30:26 AM
|
Electrical Rough-In | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PASS |
Jack Frank
|
|
|
###-#### u/g n ok 4/25/00
|
Rough-In Permanent Service | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called see jf for details 4/21/00
|