Final | 5/24/2000 | 5/30/2000 | 5/30/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 13:09:10. Contact: ###-####.
|
Electrical Rough-In | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 14:07:58. Contact: ###-####. R/I Ok 5/5/00 11:54:15 AM
|
Electrical Rough-In | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 15:09:12. Contact: ###-####. incomplete calculation 5/4/00 2:51:13 PM
|
Rough-In Permanent Service | 5/1/2000 | 5/3/2000 | 5/3/2000 | A | FAIL |
Pat Lass
|
|
|
###-#### requires load calculation for serrvice 5/4/00 8:23:59 AM
|