Final | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 12:18:00. Contact: ###-####. p/s o/h rec 5/19/00 12:14:01 PM
|
Electrical Rough-In | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PASS |
Jack Frank
|
|
|
conference ###-####
|
Final | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/10/2000 at 14:12:45. Contact: ###-####. see 315 for information called 5/11/00 11:43:13 AM
|