Final | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 12:16:11. Contact: ###-####. Grounding 5/31/00 12:56:45 PM
|
Electrical Rough-In | 5/12/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 07:07:41. Contact: ###-####.
|
Electrical Rough-In | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:36:20. Contact: ###-####. cor. posted see jf 5/12/00 6:48:51 AM
|