Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PASS |
Pat Lass
|
|
|
###-#### aaron
|
Final | 1/16/2001 | 1/17/2001 | 1/17/2001 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 15:58:50. Contact: ###-####. R/I Ok not ready for final 1/17/2001 2:09:37 PM
|
Electrical Rough-In | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:28:24. Contact: ###-####.210-52 250-148 12/19/2000 2:49:10 PM
|