Final | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 10:48:43. Contact: ###-####.
|
Rough-In Permanent Service | 6/21/2000 | 6/22/2000 | 6/22/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 21:54:03. Contact: ###-####.
|
Electrical Rough-In | 5/26/2000 | 5/26/2000 | 5/26/2000 | P | PASS |
Joe Ray
|
|
|
swimming pool bonding inspection only ###-####
|