Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberELE00-01971
StatusFinaled
Name ROMAR ELECTRIC
Site Address 251 E FRONT
Project NameONE FRONT SHELL
Customer Number20045
ePlanReview 
Description
electrical wiring for new core and shell as per Boise City approved plans $341,607.00 initial cert aml 4/23--final cert 370,417.00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/29/20013/30/20013/30/2001PPASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 03/29/2001 at 12:58:53. Contact: ###-####. shell and core completed. ok. 3/30/2001 3:23:39 PM
Electrical Rough-In3/15/20013/15/20013/15/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 03/15/2001 at 07:46:20. Contact: ###-####. 1st floor lobby ceiling ele r/i;
2nd floor bathrooms ceiling ele r/i ok. 3/15/2001 3:05:11 PM
Electrical Rough-In3/8/20013/9/20013/9/2001APART
DetailsMarv Burrus
###-####. basement, 3rd & 4th floor ceiling ele r/i, ok. 3/9/2001 11:38:30 AM
Electrical Rough-In2/19/20012/20/20012/20/2001APASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 02/19/2001 at 10:45:32. Contact: ###-####. 4 outside recess cans 2/20/2001 12:50:50 PM
Electrical Rough-In2/14/20012/14/20012/14/2001APART
DetailsMarv Burrus
Added by Inspector: 403 On 2/14/2001 12:53:07 PM conference: service panel; grounding/bonding.
Permanent Service2/14/20012/14/20012/14/2001APART
DetailsMike Kinnear
Added by Inspector: 412 On 2/14/2001 1:34:56 PM conf with contractor
Permanent Service2/14/20012/14/20012/14/2001PPASS
DetailsMike Kinnear
Added by Inspector: 412 On 2/14/2001 12:43:50 PM conf with contractor on sub panals
Permanent Service2/12/20012/13/20012/13/2001APASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 02/12/2001 at 13:12:03. Contact:

meter/main service distribution panel. ok
p/s ug n romar ele #01971
parkviewn add Lot: 0 Block: 1 2/13/2001 11:41:12 AM
Electrical Rough-In2/7/20012/7/20012/7/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 02/07/2001 at 09:57:55. Contact: ###-####.. exterior recessed cans; bump-out areas ele r/i.. 2/7/2001 2:49:18 PM
Electrical Rough-In2/2/20012/5/20012/5/2001PPASS
DetailsJim Schmer
Scheduled by a contractor via Hello! on 02/02/2001 at 15:40:58. Contact: ###-####. 2-3-4 front of elevator & cieling in ramp - ok 2/5/2001 12:23:45 PM
Electrical Rough-In2/1/20012/2/20012/2/2001PPART
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 02/01/2001 at 11:58:45. Contact: ###-####. ok cover part stairwell @ bump outs 2/2/2001 1:15:53 PM
Electrical Rough-In2/1/20012/2/20012/2/2001PPART
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 02/01/2001 at 11:58:45. Contact: ###-####. ok cover part stairwell @ bump outs 2/2/2001 1:15:53 PM
Electrical Rough-In1/23/20011/24/20011/24/2001APART
DetailsMarv Burrus
###-####. basement &1st floor entry area r/i
stairtower, 1st thru 4th floor ele r/i. 1/24/2001 11:38:52 AM
Electrical Rough-In1/12/20011/16/20011/16/2001APART
DetailsMarv Burrus
r/i-- ###-#### kelly. basement, 1st floor stairtower r/i, 4th floor exterior soffit lighting r/i. 1/16/2001 10:07:57 AM
Electrical Rough-In1/5/20011/8/20011/8/2001APART
DetailsMarv Burrus
Kelly ###-####. bathrooms, ele r/i; floors #1 thru #4. ok 1/8/2001 11:10:28 AM
Electrical Rough-In10/20/200010/20/200010/20/2000PPASS
DetailsMarv Burrus
R/I --JIM ###-####. pvc in pad ready for concrete pour. 10/20/2000 10:09:00 PM
Electrical Rough-In7/25/20007/26/20007/26/2000APASS
DetailsJim Schmer
Scheduled by a contractor via Hello! on 07/25/2000 at 09:30:27. Contact: ###-####. 40' PVC so of building (service lateral). 7/26/00 10:58:00 AM
Electrical Rough-In6/14/20006/15/20006/15/2000APART
DetailsMarv Burrus
###-#### don\\Conf only Ufer grounding 6/16/00 8:52:42 AM