Final | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PASS |
Marv Burrus
|
|
|
FN JOHN ###-#### CALL 1ST BEFORE INSP-RE-INSP. corrections completed. 11/1/2000 11:59:06 AM
|
Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 09:10:43. Contact: ###-####. no access; left card, called contractor. will reschedule. 10/26/2000 5:47:55 PM
|
Final | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 12:20:36. Contact: ###-####. nec: 210-8; garage gfci recepticles required. called contractor. 10/23/2000 11:53:59 AM
|
Rough-In Permanent Service | 7/24/2000 | 7/25/2000 | 7/25/2000 | P | PASS |
Jim Schmer
|
|
|
###-#### P/S O/H REc called to IP talked to 7/26/00 10:46:22 AM
|
Electrical Rough-In | 6/15/2000 | 6/16/2000 | 6/16/2000 | P | PART |
Marv Burrus
|
|
|
r/i okay to cover only in the garage jimmy ###-#### garage R/I only 6/19/00 1:55:41 PM
|