Final | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 12:07:44. Contact: ###-####.
|
Electrical Rough-In | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | PASS |
Marv Burrus
|
|
|
###-#### Upstairs bathroom. remodel. 6/21/00 11:57:30 AM
|