Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 14:08:12. Contact: ###-####.
|
Permanent Service | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PASS |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 6/28/2000 | 6/28/2000 | 6/28/2000 | A | PASS |
Jim Schmer
|
|
|
|
Electrical Rough-In | 6/27/2000 | 6/27/2000 | 6/27/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 09:53:44. Contact: ###-####. insulation not removed 6/28/00 9:23:42 AM
|
Electrical Rough-In | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 09:01:00. Contact: ###-####. remove insulation 6/27/00 7:34:59 AM
|
Rough-In Permanent Service | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Pat Lass
|
|
|
Bernice ###-#### 6 violations posted 6/23/00 7:36:25 AM
|