Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 09:10:00. Contact: ###-####. ok final 10/19/2000 5:22:29 PM
|
Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 07:39:15. Contact: ###-####. conf. with contractor they need to have everything wired SPA 10/18/2000 3:32:45 PM
|
Electrical Rough-In | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | PASS |
Mike Kinnear
|
|
|
###-#### P/S U?G n ok 6/29/00 10:14:18 AM Dk cover RI 6/29/00 10:14:27 AM
|
Rough-In Permanent Service | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | CONF |
Mike Kinnear
|
|
|
RODEY ###-#### HS OVER 400 AMPS 14 ROOMS AND A/C AND A SPA conference 6/28/00 1:41:35 PM
|