Final | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 10:53:11. Contact: ###-####. Ok final 7/26/00 1:21:26 PM
|
Electrical Rough-In | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 15:39:51. Contact: ###-####.
|
Electrical Rough-In | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 10:42:04. Contact: ###-####. Ceiling covered before inspection correction posted $42.00 fee due required before reinspection (please note). 7/13/00 11:24:59 AM
|
Electrical Rough-In | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 09:37:10. Contact: ###-####. Corrections not made 7/12/00 6:53:51 AM
|
Electrical Rough-In | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 10:53:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/07/2000 at 11:09:20.
|
Electrical Rough-In | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 10:18:49. Contact: ###-####. Correction posted called support EMT to many bends, needs KO seals (ceiling). 7/7/00 12:59:09 PM
|
Electrical Rough-In | 6/27/2000 | 6/28/2000 | 6/28/2000 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 16:21:57. Contact: ###-####.
|