Final | 9/12/2000 | 9/13/2000 | 9/13/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 13:39:50. Contact: ###-####. ok 9/13/2000 12:17:00 PM
|
Final | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 15:47:43. Contact: ###-####. BCC need to inspect concrete 9/12/00 11:01:28 AM
|
Final | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 16:54:55. Contact: ###-####. Corrections NEC 300-5 NEC 110-26 9/12/00 10:59:16 AM
|
Rough-In Permanent Service | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Jack Frank
|
|
|
###-#### Ok U/G new 7/18/00 1:15:54 PM
|