Final | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 16:08:00. Contact: ###-####.
|
Electrical Rough-In | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 13:48:34. Contact: ###-####.
|