Final | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 09:31:57. Contact: ###-####. ok final 12/11/2000 4:06:10 PM
|
Permanent Service | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 10:07:18. Contact: ###-####.
|
Electrical Rough-In | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Joe Ray
|
|
|
cover insp for a trench Alan ###-####
|
Electrical Rough-In | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PASS |
Joe Ray
|
|
|
ufer ground Boise Basin Elec ###-####
|