Final | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 15:20:46. Contact: ###-####.
|
Electrical Rough-In | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Joe Ray
|
|
|
###-####\\rick ###-####\ conf only
|
Electrical Rough-In | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PART |
Jack Frank
|
|
|
Added by Inspector:336 On 10/10/2000 conference ok 10/10/2000 12:30:06 PM
|
Electrical Rough-In | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 10/10/2000 conference ok
|
Permanent Service | 10/6/2000 | 10/9/2000 | 10/9/2000 | A | PASS |
Jack Frank
|
|
|
###-#### p/s u/g new ok 10/9/2000 12:29:40 PM
|
Electrical Rough-In | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 10:24:58. Contact: ###-####. underground 9/5/2000 7:31:26 AM
|
Electrical Rough-In | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 13:38:22. Contact: ###-####. UFER OK FOR COVER 8/2/00 12:12:55 PM
|