Final | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 11:10:52. Contact: ###-####.
|
Electrical Rough-In | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PASS |
Joe Ray
|
|
|
R/I PROTEC SYS--###-####--T GRIDS IN SMALL ROOMS
|
Final | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 16:43:00. Contact: ###-####. temp/occup 9/21/2000 4:15:17 PM
|
Electrical Rough-In | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 16:31:59. Contact: ###-####.--FOR T-GRID INSP ONLY ceiling ok
9/15/2000 10:02:03 AM
|
Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 09:01:34. Contact: ###-####. Inspector t grid in the main room for cover cor. posted ceiling covered before inspection 9/14/2000 4:39:50 PM
|
Electrical Rough-In | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 15:22:09. Contact: ###-####. FOR FLOOR BOXES ONLY INSP
|
Electrical Rough-In | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:35:42. Contact: ###-####. cover inspection for vestibule and the bathrooms
|
Electrical Rough-In | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 12:03:49. Contact: ###-####.
|