Final | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 12:34:50. Contact: ###-####.
|
Electrical Rough-In | 3/22/2001 | 3/23/2001 | 3/23/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 21:56:05. Contact: .
|
Electrical Rough-In | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | FAIL |
Pat Lass
|
|
|
###-#### no pig-tails unused openings secure romex within 8" 6" of free conductor 3/19/2001 12:01:19 PM
|
Electrical Rough-In | 3/9/2001 | 3/12/2001 | 3/12/2001 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 12:36:41. Contact: ###-####. Held conf 3/12/2001 9:42:53 AM
|