Final | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:28:06. Contact: ###-####.
|
Electrical Rough-In | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:10:05. Contact: ###-####.
|