Final | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 09:03:01. Contact: ###-####. ok 9/8/2000 4:16:16 PM
|
Electrical Rough-In | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 08:25:44. Contact: ###-####. utility room remodel. 8/29/2000 3:47:18 PM
|