Final | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 08:45:04. Contact: ###-####.
|
Final | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 15:15:39. Contact: ###-####. ok for ceiling cover 9/28/2000 9:00:46 AM
|
Permanent Service | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 11:08:27. Contact: ###-####.
|
Electrical Rough-In | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 08:53:07. Contact: ###-####. bathrooms ok for cover 9/13/2000 2:50:32 PM
|
Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 | A | CANC |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:25:03. Contact: . was suppose to be pm insp. 9/8/2000 4:24:55 PM
|
Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:26:10. Contact: . walls only, back bathroom - do not cover - has condulet in bottom rt. back wall - needs to be exposed. 9/8/2000 4:27:06 PM
|