Final | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 17:42:08. Contact: ###-####. ok 11/30/2000 11:49:15 AM
|
Rough-In Permanent Service | 9/26/2000 | 9/28/2000 | 9/28/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/26/2000 at 12:36:19. Contact: ###-####. ok 9/28/2000 12:10:30 PM
|
Rough-In Permanent Service | 9/18/2000 | 9/20/2000 | 9/20/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 14:18:16. Contact: ###-####. BCC needs windows installed, so building is prtected from the elements called 9/20/2000 12:00:02 PM
|