Final | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 14:48:25. Contact: ###-####.
|
Electrical Rough-In | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 14:44:41. Contact: ###-####. Only ceiling before sheetrock. bathroom ceilings ok for cover 9/29/2000 8:24:11 AM
|
Electrical Rough-In | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 14:36:55. Contact: ###-####.
|
Electrical Rough-In | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 15:34:29. Contact: ###-####. walls only 9/11/2000 11:46:37 AM
|