Final | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PASS |
Pat Lass
|
|
|
h p ###-#### pager fn final Ok 2/7/2001 2:08:36 PM
|
Final | 1/8/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Pat Lass
|
|
|
HP-- ###-#### FN T/O Ok equipment hook up not done 1/10/2001 2:38:59 PM
|
Electrical Rough-In | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Pat Lass
|
|
|
CEILING INSP- HP ###-#### surveyed 4 straps in ceiling 1/8/2001 2:52:54 PM
|
Rough-In Permanent Service | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 14:31:57. Contact: ###-####. p/s only ug n 12/28/2000 10:44:39 AM
|
Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PASS |
Pat Lass
|
|
|
PARTIAL R/I IN BASEMENT-- ###-#### HP
|
Electrical Rough-In | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | PASS |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | PASS |
Pat Lass
|
|
|
UNDERGROUND \\###-####
|