Final | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 12:31:51. Contact: . ok 11/22/2000 12:20:26 PM
|
Electrical Rough-In | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Jack Frank
|
|
|
###-#### ok 9/22/2000 3:48:59 PM
|
Electrical Rough-In | 9/18/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 11:41:59. Contact: .
no r/i conference ok 9/19/2000 4:33:00 PM
|
Electrical Rough-In | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | NH |
Jack Frank
|
|
|
SKIP -###-#### -OK TO COVER notice posted, and called left message 9/18/2000 7:55:30 AM
|