Final | 10/24/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Jack Frank
|
|
|
STEVE ###-#### ok 10/26/2000 7:36:19 AM
|
Final | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | CANC |
Jack Frank
|
|
|
STEVE ###-#### FN canceled by contractor 10/24/2000 4:13:37 PM
|
Rough-In Permanent Service | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | PASS |
Jack Frank
|
|
|
Steve ###-#### p/s o/h new walls and ceiling ok 9/22/2000 1:16:37 AM
|
Permanent Service | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PART |
Jack Frank
|
|
|
###-#### conference ok p/s not ready 9/19/2000 8:06:53 AM
|
Electrical Rough-In | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | FAIL |
Jack Frank
|
|
|
ceiling inspection ###-#### cor. posted called flex from jbox to fixture not supported 9/18/2000 7:57:52 AM
|