Final | 2/13/2001 | 2/14/2001 | 2/14/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 11:32:02. Contact: ###-####. completed. 2/14/2001 11:35:40 AM
|
Electrical Rough-In | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 16:15:54. Contact: ###-####. area of needed inspection covered over with sheetrock. contacted contractor for removal. 9/22/2000 5:07:02 PM
|
Electrical Rough-In | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 09:08:09. Contact: ###-####. ok, corrections completed. copier room, walls ele r/i . 9/22/2000 5:18:02 PM 9/22/2000 5:20:18 PM
|