Final | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 08:36:21. Contact: ###-####. no access called contr 11/28/2000 10:03:16 AM
|
Final | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 11:12:11. Contact: ###-####.
|
Rough-In Permanent Service | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 08:05:09. Contact: ###-####.
|