Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 06:27:35. Contact: ###-####. not ready 10/26/2000 11:55:24 AM
|
Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 10/12/2000 | 10/12/2000 | 10/12/2000 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/12/2000 at 06:52:26. Contact: ###-####. Phase 1 I.A Ok 10/12/2000 12:25:04 PM
|
Electrical Rough-In | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Pat Lass
|
|
|
Dave ###-#### Upper level intimate apparrel and kids dept. phase 1 walls ok 9/22/2000 3:14:45 PM
|