Final | 4/13/2001 | 4/13/2001 | 4/13/2001 | A | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 4/13/2001 11:45:32 AM ok final
|
Final | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | CANC |
Mike Kinnear
|
|
|
###-#### reinspection they still do not have the equip labled 4/11/2001 10:01:58 AM
|
Final | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 13:42:55. Contact: ###-####. corrections nec 110-3(b) listed and labled all electrical equip bcc all work shall be complete (site lighting not done) gave temp occp. 3/9/2001 11:06:13 AM
|
Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | NR |
Mike Kinnear
|
|
|
###-#### not ready 3/8/2001 12:13:20 PM
|
Electrical Rough-In | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### ceiling ok cover ceiling inspected of office rooms for final ok 2/23/2001 1:30:07 PM
|
Electrical Rough-In | 1/31/2001 | 1/31/2001 | 1/31/2001 | P | PASS |
Jack Frank
|
|
|
###-#### marked print of what I inspected ok 1/31/2001 2:07:09 PM
|
Electrical Rough-In | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Mike Kinnear
|
|
|
###-#### part ok cover walls hilited on print 1/24/2001 2:24:19 PM
|
Permanent Service | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### p/s u/g n ok 1/22/2001 12:02:20 PM
|
Electrical Rough-In | 1/17/2001 | 1/18/2001 | 1/18/2001 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 15:09:20. Contact: ###-####. conf with contractor 1/18/2001 12:01:40 PM
|
Electrical Rough-In | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/18/2001 12:55:16 PM met with 412 on job for conference
|