ELE-Aging Inspection | 2/20/2003 | 2/20/2003 | 2/20/2003 | | PASS |
Pat Lass
|
|
|
|
Final | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | FAIL |
Marv Burrus
|
|
|
###-#### Doherty work only . no information received concerning generator field evaluation test. 3/22/2001 10:32:29 AM
|
Final | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PASS |
Marv Burrus
|
|
|
Added by Inspector: 403 On 3/22/2001 1:23:56 PM representitive from ETI TESINg LABORATORY confirmed field testing of emergency was satisfactory, as per jschmer. ok.
|
Final | 3/19/2001 | 3/21/2001 | 3/21/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 16:35:38. Contact: ###-####. temp only low voltage is not done see jf for details 3/21/2001 10:44:57 AM
|
Electrical Rough-In | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Marv Burrus
|
|
|
###-#### GEN.HOOK UP. grounding for generator. ok. 3/6/2001 1:21:04 PM
|
Electrical Rough-In | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 09:11:20. Contact: ###-####. 1st floor ceiling ele r/i, ok. 2/20/2001 3:18:22 PM
|
Electrical Rough-In | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 10:24:13. Contact: ###-####. ceiling ele r/i, ok. 2/15/2001 10:36:23 AM
|
Electrical Rough-In | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 16:44:04. Contact: ###-####. contractor not ready for ceiling inspection 1/26/2001 8:30:18 AM
|
Electrical Rough-In | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Jack Frank
|
|
|
Paul ###-#### conference ok 1/18/2001 3:33:53 PM
|
Electrical Rough-In | 1/9/2001 | 1/10/2001 | 1/10/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 14:23:49. Contact: ###-####. 2-inner walls ele r/i. ok 1/10/2001 10:03:31 AM
|
Electrical Rough-In | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:09:02. Contact: ###-####. walls southside 1st floor, ele r/i. 10/31/2000 5:23:02 PM
|
Electrical Rough-In | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 16:56:06. Contact: ###-####. northend-half; walls ele r/i. 10/19/2000 12:29:01 PM
|
Electrical Rough-In | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 08:45:01. Contact: ###-####. lyle ###-#### r/i . mezanine level; walls ele r/i. 10/17/2000 9:27:51 PM
|