Final | 11/3/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 16:00:43. Contact: ###-####. ok 11/6/2000 4:31:36 PM
|
Final | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 07:48:40. Contact: ###-####. see jf for details 11/3/2000 5:03:15 PM
|
Electrical Rough-In | 10/5/2000 | 10/5/2000 | 10/5/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/05/2000 at 10:00:36. Contact: ###-####.
|
Electrical Rough-In | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 08:27:09. Contact: ###-####. Protection unused opening bends broken 9/28/2000 4:17:56 PM
|