Electrical Rough-In | 11/24/2000 | 11/24/2000 | 11/24/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/24/2000 at 07:56:57. Contact: ###-####. walls and ceiling 1st phase ok 11/24/2000 4:39:10 PM
|
Electrical Rough-In | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 08:05:08. Contact: ###-####. corrections not made 11/22/2000 4:34:19 PM
|
Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Pat Lass
|
|
|
FN MITCH ###-####
|