Final | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 17:02:09. Contact: ###-####. called 10/31/2000 3:19:21 PM
|
Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 09:15:19. Contact: ###-####. ok 10/31/2000 3:19:43 PM
|
Electrical Rough-In | 10/10/2000 | 10/11/2000 | 10/11/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 15:13:25. Contact: ###-####. ok 10/11/2000 12:09:25 PM
|
Electrical Rough-In | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | FAIL |
Jack Frank
|
|
|
###-####cor. posted called 370-16 3 gang box, 370-20 outside box not flush with siding, needs approved floor box window wall 10/10/2000 12:27:04 PM
|