Final | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 14:45:04. Contact: ###-####. Building occupied checked what I could ok 2/7/2001 9:10:18 AM
|
Electrical Rough-In | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 08:04:33. Contact: ###-####.
|