Final | 11/14/2000 | 11/15/2000 | 11/15/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 09:55:58. Contact: ###-####. side gate around the back to the addition and the door is open the breaker panel is in the garage
|
Electrical Rough-In | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Joe Ray
|
|
|
###-#### Go into back gate you can access
|