Final | 11/9/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 16:12:27. Contact: ###-####. ok 11/13/2000 5:04:00 PM
|
Electrical Rough-In | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 08:35:02. Contact: ###-####. ok 10/26/2000 7:36:13 AM
|