Final | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Mike Kinnear
|
|
|
frank ###-#### reinspection ok final 3/15/2001 8:58:42 AM
|
Final | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | PART |
Mike Kinnear
|
|
|
FRANK - ###-#### RE-INSP FN conf with electrian 3/14/2001 1:29:32 PM
|
Final | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | NR |
Mike Kinnear
|
|
|
###-#### finaled everything except the air conditioners 3/12/2001 1:34:38 PM
|
Electrical Rough-In | 11/8/2000 | 11/8/2000 | 11/8/2000 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/8/2000 8:50:34 AM R/I 2ND AND 1ST FLOOR
|
Permanent Service | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Jack Frank
|
|
|
1ST & 2ND FLOOR PER SER--FRANK ###-#### p/s u/g new r/i 1st 2nd floors ok 11/7/2000 1:22:24 PM
|
Electrical Rough-In | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | PASS |
Mike Kinnear
|
|
|
3rd floor only ###-#### ok cover third floor ri 10/30/2000 7:36:19 AM
|