ELE-Aging Inspection | 2/3/2003 | 2/3/2003 | 2/3/2003 | | PASS |
Pat Lass
|
|
|
|
Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PART |
Mike Kinnear
|
|
|
###-#### ok temp occ. 12/28/2000 10:01:41 AM
|
Final | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 10:18:17. Contact: ###-####. inspected for final everything ok 12/27/2000 1:17:35 PM
|
Electrical Rough-In | 12/22/2000 | 12/26/2000 | 12/26/2000 | A | CANC |
Mike Kinnear
|
|
|
FOR CONF JOHN ###-#### called contractor he wanted jack to do inspecion will call in for afternoon 12/26/2000 9:10:20 AM
|
Electrical Rough-In | 12/26/2000 | 12/26/2000 | 12/26/2000 | A | PART |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 12/26/2000 10:00:54 AM conf with contractor
|
Electrical Rough-In | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PASS |
Marv Burrus
|
|
|
Added by Inspector: 403 On 12/14/2000 3:27:32 PM
|
Electrical Rough-In | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 13:08:20. Contact: ###-####. low-voltage wiring corrections completed. 11/22/2000 11:43:28 AM
|
Electrical Rough-In | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | PART |
Marv Burrus
|
|
|
###-####. 1st floor ele r/i; walls. corrections posted for low-voltage conduit installation; supports, and bends. installed by other contractor. 11/13/2000 9:07:49 PM
|