Final | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/14/2001 at 16:40:26. Contact: ###-####. corrections completed. ok. 6/15/2001 10:15:55 AM
|
Final | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 16:26:11. Contact: ###-####. nec: 110-16. clearances; shall have 36 inches in front of disconnect, (rooftop hvac unit). nec: 210-8. rooftop hvac units shall have gfci recepticles, ( not operational). 6/12/2001 11:19:42 AM
|
Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PART |
Marv Burrus
|
|
|
###-####. temporary occupancy. ok. 6/5/2001 11:04:19 AM
|
Electrical Rough-In | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 14:10:09. Contact: ###-####. r/i floor 2nd floor bar 5/18/2001 8:46:00 AM
|
Permanent Service | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 09:56:17. Contact: ###-####. permit doesn't cover services. 1/29/2001 3:54:02 PM
|
Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 10:35:48. Contact: ###-####.
|
Electrical Rough-In | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 13:03:10. Contact: ###-####. 3rd floor walls and corridor ele r/i. 12/6/2000 9:58:40 AM
|
Electrical Rough-In | 11/21/2000 | 11/22/2000 | 11/22/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:41:31. Contact: ###-####. 2nd floor; kitchen walls ele r/i. 11/23/2000 8:19:13 PM
|