Final | 12/18/2000 | 12/19/2000 | 12/19/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 13:26:49. Contact: ###-####. completed. 12/19/2000 4:52:45 PM
|
Electrical Rough-In | 12/8/2000 | 12/11/2000 | 12/11/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 14:32:16. Contact: ###-####.. 4th floor; ceiling ele r/i. ok. 12/11/2000 3:52:16 PM
|
Electrical Rough-In | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 10:42:58. Contact: ###-####. 4th floors; walls ele r/i. 11/16/2000 5:07:08 PM
|