Final | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 13:22:01. Contact: ###-####.
|
Final | 11/22/2000 | 11/27/2000 | 11/27/2000 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 08:34:57. Contact: ###-####. man. spec. no. 6 cu /gfci 10-20 from tub 11/27/2000 10:18:15 AM
|
Final | 11/17/2000 | 11/20/2000 | 11/20/2000 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 13:15:33. Contact: ###-####.
|