Final | 12/14/2000 | 12/18/2000 | 12/18/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 13:18:18. Contact: ###-####.
|
Rough-In Permanent Service | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 16:34:58. Contact: ###-####. p/s o/h new ok 12/6/2000 2:39:07 PM
|
Electrical Rough-In | 11/29/2000 | 11/30/2000 | 11/29/2000 | A | PASS |
Jack Frank
|
|
|
jeff ###-#### ok 11/29/2000 4:12:26 PM
|