Final | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 10:48:30. Contact: ###-####.
|
Electrical Rough-In | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Jack Frank
|
|
|
underground and bond ###-#### ok 3/9/2001 10:48:02 AM
|
Electrical Rough-In | 12/5/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Joe Ray
|
|
|
###-#### pool bond ok 12/7/2000 2:22:45 PM
|