Final | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | FAIL |
Joe Ray
|
|
|
FN--BRENA -- ###-#### no ceiling inspection before tiles were installed 1/19/2001 9:28:08 AM
|
Final | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 10:18:34. Contact: ###-####.
|
Electrical Rough-In | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:12:38. Contact: ###-####.
|